Region: Sub-Saharan Africa
Country: Tanzania
Sector: Energy and Power
Topic: Pro-poor, Climate-Smart
Keywords: Energy and Power, Energy and Power Core
Document Link(s):
Document Summary:
Model Power Purchase Agreement for a hydropower project published by the Energy and Water Utilities Regulatory Authority (EWURA). Model Agreement for the sale of power from a hydro power generation plant of installed capacity more than 10 MW for 30 years. The draft agreement is to be used as a starting point in the procurement of hydropower projects and needs to be adjusted on a case by case basis.
Document Details:
Model Power Purchase Agreement for a hydropower project published by the Energy and Water Utilities Regulatory Authority (EWURA). Model Agreement for the sale of power from a hydro power generation plant of installed capacity more than 10 MW for 30 years. The draft agreement is to be used as a starting point in the procurement of hydropower projects and needs to be adjusted on a case by case basis.
Updated: October 25, 2021