Title: Terms of Reference: Technical Due Diligence Wind Power Project
Language: English
Type: Document
Nature: Terms of Reference (TORs)
Published: January 1, 2024
Region: Latin America and Caribbean (LAC)
Country: Uruguay
Sector: Energy and Power
Topic: Climate-Smart
Keywords: PPPs by Sector *, Energy and Power PPPs **, Uruguay, Climate Smart, Due diligence, Wind power
Document(s):
Document Summary:
For other information on wind energy projects, please visit Energy and Power PPPs which provides sample laws and regulations, power purchase agreements, sample terms of references and handbooks.
Document Details:
I. Project Background
1.1 The [Lender] (“LENDER”) is considering providing limited recourse long term financing for the development, construction and operation of a 65 MW wind farm (the “Project”).
1.2 The Project is been developed by [*] (the “Sponsor”) which has established a special purpose company (“Project Company”) for the sole purpose of owning and operating the Project.
1.3 Project Company has entered into three separate 20-year power purchase agreements (“PPA”) with the National Electricity Company (“OFFTAKER”), the state-owned, vertically integrated electricity company for selling all energy produced by the Project.
1.4 Project Company is expected to enter into an EPC Contract with [*] (the “EPC Contractor”) for the construction of the Project and into an Operation and Maintenance Contract with [*] (the “O&M Contractor”). EPC Contractor and O&M Contractor are both controlled by the Sponsor. For additional information about the expected contractual structure refer to Annex A of this TOR.
1.5 The Project will consist of 44 - 1,5 MW wind turbines, which will be produced by EPC Contractor in its manufacturing facilities.
For more information on renewable energy projects, please visit the following:
Tracking Number: TechnicalDueDiligenceWind_Undated_English