Environmental and Social Studies and Standards
Photo Credit: Image by Pixabay
Potential damage to the environment and the impact on populations are key issues when planning infrastructure projects. Besides the cost-benefit analysis that determines whether the expected benefits of a project outweigh potential detrimental environmental and social (E&S) impacts, there is increasing recognition that the success of a project depends on managing E&S risks and impacts effectively in addition to managing its technical and financial aspects. Investment decisions increasingly include an assessment of the management of E&S risks and impacts—not only when MDBs and international financial institutions are involved but also when commercial banks and private equity funds are the source of financing. Furthermore, in many developing countries international players require compliance with both national laws and international E&S standards developed by MDBs, which are sometimes more stringent than those imbedded in national legislation. A key element in E&S risk management is the mitigation hierarchy, whereby priority is given to avoidance and minimization of impacts. Where residual risks or impacts remain, a compensation or offset is provided to support relocated persons and affected communities, or to mitigate risks to the environment. E&S studies are necessary to determine how to mitigate these risks and impacts and how to compensate those affected by them. For example, if people living on or near a proposed construction site of a PPP project will be displaced, E&S studies should consider ways to minimize displacement and propose specific measures to compensate relocated persons fairly. There are cases where the need for compensation is not as obvious as in the case of displaced people. For example, building a new bridge may benefit passengers, but could also prevent a ferry operator from collecting monopoly fees. Loss of a monopoly position does not necessarily require compensation. If the livelihood of ferry employees is greatly affected, solutions such as skills training and job search support could be provided to reduce social impacts, or ensure that they do not fall disproportionately on the most vulnerable. The E&S studies should address the whole life cycle of the project, including design, construction, operation, and decommissioning. The assessment should consider sectoral and national policies, legislation and regulations, governance frameworks, and environmental capacity. These studies should be conducted early in the project preparation phase so that the findings can be considered in the decision-making process. In the PPP context, this translates into assessing E&S risks and developing mitigations during PPP preparation and procurement. Introducing E&S risk management steps when structuring a PPP project can improve the quality of the project, help it achieve political, social and environmental sustainability, prevent conflicts, and avoid delays. Impacts to PPP timeline and related cost implication could be avoided when stakeholders impacted by the project (or perceived to be impacted) are adequately engaged and risks and impacts are recognized at a stage that allows integration of mitigation strategies in the project design. Examples of this include: Countries have found advantages in creating their own framework for E&S assessment in several stages of the PPP project cycle. These frameworks include provisions for: Several countries have found it effective to define E&S mitigation requirements prior to tendering projects. This approach allows bidders to factor the cost of these measures into their bid. Good practice consists of including the E&S constraints in the Call for Tender documents, thereby allowing bidders and concessionaires to design and implement projects at their own risk, subject to the satisfaction of those constraints. This approach is followed by IFC when providing advice to governments on structuring PPP projects. During the appraisal stage an E&S due diligence is undertaken to: E&S due diligence enables government officials, bidders, and other stakeholders to understand key E&S issues affecting PPP projects. It also supports development of projects in line with national legislation and international E&S standards. The outcomes of the E&S due diligence also feed into specific steps of the PPP project appraisal stage such as the assessment of technical feasibility and the assessment of commercial viability which needs to include the cost estimate of identified mitigation measures. They also inform risk allocation during PPP structuring (see Structuring PPP Projects) and the E&S specific provisions of the draft contract. E&S studies should distinguish between mitigation measures to be implemented by the PPP operator and by the contracting authority before contract award. For example, stakeholder engagement (see Stakeholder Communication and Engagement) should often be started by the contracting authority in the PPP preparation stage, and then taken over by the private partner. A good example of this approach is found in the guidance notes on screening (EC 2001c), scoping (EC 2001b) and review (EC 2001a) of the European Environmental Impact Assessment (EIA) scheme. This requires governments to submit the EIA to the environmental authority before the project is implemented. Based on the assessment, the authority will issue an environmental license identifying the constraints affecting the project. In a second phase, a more detailed project design that explains how the constraints will be mitigated is submitted for approval. This process allows for the government to establish limits prior to tendering, and for the potential concessionaire to present the detailed project. It is good practice to include E&S standards in the draft PPP project agreement. Certain standards may be required by national legislation, or by international finance institutions and major commercial banks (for example, signatories of the Equator Principles) as a financing condition. The contracting authority will need to detail how the service provider will be monitored to ensure compliance with these standards. The consequences for failure to meet these standards also need to be established. The E&S-related provisions of the draft project agreement should reflect the allocation of responsibilities for the design and implementation of E&S mitigation. Depending on the level of E&S risks of the project, and complexity associated with the design and implementation of the mitigation measures, the (pre) qualification criteria might benefit from the introduction of E&S-related criteria. For large projects, the contracting authority may also supplement the national environment-protection framework with contractual provisions in the PPP contract discouraging the service provider from damaging the environment. MDBs and other international development institutions are attentive to E&S issues when they co-finance an infrastructure project. The World Bank’s Environmental and Social Framework rules (WB 2016c) are often more stringent than the host country’s national legislation. The World Bank may accept the country's E&S standards or require that the utilization of the Bank’s own E&S safeguards standards. Then they must apply over the entire project, even if they are only financing a portion of it. There are ten World Bank E&S standards: These standards were approved by the Board in August 2016, to be implemented after a preparation and training period. According to the World Bank (WB-Safeguards), the new E&S framework introduces comprehensive labor and working condition protection; an over-arching non-discrimination principle; community health and safety measures that address road safety, emergency response and disaster mitigation; and a responsibility to include stakeholder engagement throughout the project cycle. Other MDBs have their own corresponding standards. For example, the Asian Development Bank (ADB-Safeguards) and Asian Infrastructure Investment Bank (AIIB 2016) use three safeguard categories: (1) Environment; (2) Involuntary Resettlement; and (3) Indigenous Peoples. IFC has developed a risk management methodology (IFC 2012) consisting of eight Performance Standards (PS). Compliance with these standards is required for projects financed by IFC. Since 2012, all PPP projects where the IFC had an advisory mandate are screened against the Performance Standards and, where gaps are identified, recommendations are made to align them with the standards. IFC’s Performance Standards are a global benchmark to determine, assess, and manage E&S risks in project financing. Eighty-four private financial institutions in 35 countries have adopted the ten Equator Principles (EP 2017), which are based on IFC’s Performance Standards. The Equator Principles have been accepted as a move towards establishing an industry norm for managing environmental issues. In summary, a proper assessment and mitigation of E&S risks will likely have a significant impact on the perceived value of a project, increasing its probability of success. The value for several categories of stakeholders is highlighted below: Environmental and Social Studies and Standards
Environmental and social assessments
Effective use of environmental and social standards
Key References
Find in pdf at PPP Reference Guide - PPP Cycle or visit the PPP Online Reference Guide section to find out more.
Updated:
Related Content
INTRODUCTION
Page Specific DisclaimerVisit the PPP Online Reference Guide section to find out more.
PPP BASICS: WHAT AND WHY
Page Specific DisclaimerVisit the PPP Online Reference Guide section to find out more.
Featured Section LinksESTABLISHING THE PPP FRAMEWORK
Page Specific DisclaimerVisit the PPP Online Reference Guide section to find out more.
PPP CYCLE
Page Specific DisclaimerVisit the PPP Online Reference Guide section to find out more.
Identifying PPP Projects
Type of ResourceAppraising Potential PPP Projects
Type of ResourceStructuring PPP Projects
Type of ResourceDesigning PPP Contracts
Type of ResourceManaging PPP Transactions
Type of ResourceManaging PPP Contracts
Type of ResourceDealing with Unsolicited Proposals
Type of ResourceKey References - PPP Cycle
Type of Resource