On this page: A case study on The North Toronto Collegiate Institute (NTCI), Toronto, Canada. Find more at the Municipal Public-Private Partnership Framework - Project Summaries section for brief summaries of around 100 projects from around the world, examples of successes and challenges, as well as innovative ideas on solutions, or visit the Guidelines on Innovative Revenues for Infrastructure section.
Project Summary: Background The Toronto District School Board (TDSB) was struggling to fulfill its mandate due to limited funds and land availability. One immediate priority was rehabilitating the NTCI, a public high school founded in 1912 with aging and deteriorating facilities. TDSP recognized that NTCI occupied a strategic location in midtown Toronto with direct access to public transit and a vibrant retail main street. The strategic location motivated TDSP to leverage private investment to deliver the project. Project Structure The redevelopment of the school was made possible through a unique PPP between the TDSB and a private developer, Tridel. Tridel was chosen from among ten bids received for the project. A portion (0.7 acres) of the school grounds was sold to Tridel for CAD 23 million (USD 17 million). The proceeds from the sale then used to fund part of Tridel’s investment in the new school building. Put differently, Tridel received this 0.7-acre portion of the project site in return for its USD 17 million capital investment in the new school. Tridel would then use this land for profitable, residential developments to recoup its investment. The total cost of constructing the school was CAD 52 million (US$ 39 million). Tridel was able to obtain financing for the project by leveraging its residential developments. As the building was designed to LEED standards, innovative green loan financing was obtained, based on utility payback and lifecycle costing. TDSB also provided additional funds for the completion of construction of the school, and alumni contributed funds of approximately CAD 300,000 (USD 225,700) to pay for the school heritage courtyard. The project also helped in clearing a CAD 52 million (USD 39 million) capital deficit from TDSB’s accounts. Lessons Learned The rebuilding process began in 2005, and the new school was occupied in 2010. The school facility has about 14,500 m2 of floor space, and the two residential towers have 46,500 m2. The four-story school building is designed to accommodate 1,200 students and includes science, art, music, and drama classrooms, as well as a 600-seat theatre, library, and triple gymnasium. There is also an outdoor playing field on the site, which is used by the school and accessible to residents and the general public. The project has been praised for its participatory design approach, which involved input from a number of stakeholders, including councilors, representatives of the local community, NTCI alumni, students, parents, the school board, the developer, and architects. Decision-making was done based on maximum value-generating propositions for the school, the developer, and the community at large.1 Footnote 1: Source(s): http://digitool.library. mcgill.ca/webclient/ StreamGate?folder_ id=0&dvs=1548402 095467~ 429 accessed 25 January 2019 https://www. thestar.com/life/ parent/2010/09/05/ new_north_toronto_ collegiate_opens_ sharing_space_with_ condo_towers.html accessed 25 January 2019 https://canada. constructconnect. com/dcn/news/ others/2011/04/ tridel-builds-newnorth- torontocollegiate- instituteincorporating- featuresfrom- original-1904- school-dcn044128w accessed 25 January 2019.
The Guidelines on Innovative Revenues for Infrastructure (IRI) is intended to be a living document and will be reviewed at regular intervals. They have not been prepared with any specific transaction in mind and are meant to serve only as general guidance. It is therefore critical that the Guidelines be reviewed and adapted for specific transactions.
To find more, visit the Innovative Revenues for Infrastructure section and the Content Outline, or Download the Full Report. For feedback on the content of this section of the website or suggestions for links or materials that could be included, please contact the Public-Private Partnership Resource Center at ppp@worldbank.org.
Updated:
TABLE OF CONTENTS
I. Innovative Revenues for Infrastructure (IRI)
2. Introduction to Commercial Value Capture (CVC)
3. Applying CVC in Infrastructure Projects
2. Case Studies in CVC from International Experiences
Related Content
Select WBG PPP Toolkits
Featured Section Links
Additional Resources
Climate-Smart PPPs
Type of ResourceFinance Structures for PPP
Type of ResourceFinancing and Risk Mitigation
Type of Resource
Partner Resources
Find more @ Global Platform for Sustainable Cities