Tracking Number: Tanzania Electricity Act_2008_English
Image by Pixabay
An Act to repeal and replace the Electricity Ordinance, to provide for the regulation of electricity services, regulation and planning of rural electrification, the restructuring of the electricity supply industry and for connected matters.
In this document you will find the following:
PART I: PRELIMINARY PROVISIONS. 1
1....... Short Title. 1
2....... Application. 1
3....... Commencement1
4....... Relationship with other legislation. 1
5....... Purpose of the Act1
General and for Retail and Wholesale Service (Form 200). For more information about this sector, please visit Public–Private Partnerships in Energy and Power.
Tracking Number: Tanzania Form 200 Petroleum License_Undated_English
Applications--General and for Retail and Wholesale Service. Click here for EWURA's Electricity Licensing homepage.
For more information about this sector, please visit Public–Private Partnerships in Telecommunications & ICT.
Tracking Number: Tanzania Form 100 Electricity License_Undated_English
Image by Pixabay
This is one of three documents that define the Small Power Purchase Scheme in Tanzania for
the mini-grids.
1. Standardised Small Power Purchase Agreement (SPPA) for the Mini-grids
2. Standardised Tariff Calculation Methodology (STM) for the Mini-grids [this document]
3. Detailed Tariff Calculations under the SPPA for the Mini-grids for year 2009 [Accompanying document]
For more information about this sector, please visit Public–Private Partnerships in Energy and Power.
November 2008 Version with correction to separate mini-grid STM
For more information about the sector, visit the Energy and Power Public-Private Partnerships site.
Ref: Tanzania_main
For more information about this sector, please visit Public–Private Partnerships in Energy and Power.
Image by Pixabay
The goal of the document is to “standardize” the requirements and thereby reduce transaction costs for both parties. Guidelines For Grid Interconnection of Small Power Projects in Tanzania (Part A—Mandatory Requirements and Test Procedures (38 pages), Part B—Technical Guidelines (33 pages), Part C—Appendices- Studies To Be Conducted, Islanding and Protection (44 pages) (March 2009, Working Draft For Public Consultation) (Short title: Interconnection Guidelines).
The goal of the document is to “standardize” the requirements and thereby reduce transaction costs for both parties. Guidelines For Grid Interconnection of Small Power Projects in Tanzania (Part A—Mandatory Requirements and Test Procedures (38 pages), Part B—