Réduire L'eau Non Facturée Dans Le Cadre De Contrats Basés Sur La Performance —Kuala Lumpur, Malaisie
Reducing Non-Revenue Water Through Performance-Based Contracts—Kuala Lumpur, Malaysia (in French)
In 1998, Kuala Lumpur, capital of Malaysia, faced a water shortage. Water had been rationed for 5 months. To end this situation, the Ministry of State for Water Supply engaged an operator under a performance-based contract (PBC) with the aim of reducing non-revenue water (NRW).