NRW-PCB Case Study: Bangkok, Thailand
In the late 1990s, the city of Bangkok was losing about 40 percent of water production. To reduce the losses and meet demand from a growing population, the Metropolitan Waterworks Authority hired contractors to reduce NRW under a PCB, increasing the water supply to the city’s six million inhabitants. This case study showcases this project.
Case study available in English, French and Spanish.