Region: North America
Country: United States
Topic: Climate-Smart
Keywords: Climate Smart
Document Link(s):
Document Summary:
The Facility Concession Agreement between Texas Department of Transportation and the SH 130 Concession Company related to a state-owned toll road being developed under a PPP (SH 130). Construction needs to meet the requirements set forth in the Technical Requirements (7.2.1. Facility Concession Agreement). 12.3 (no. 6) of the Technical Requirements specifies, for example the Drainage Design Criteria as follows: “all drainage structures, storm systems and outfalls shall be evaluated for the 100-year storm event”.
Document Details:
Facility Concession Agreement between Texas Department of Transportation and the SH 130 Concession Company related to a state-owned toll road being developed under a PPP (SH 130)
Updated: October 25, 2021