Library
Risk Distribution and Balance Sheet Treatment - Practical Guide
Risk Distribution and Balance Sheet Treatment - Practical Guide
Library
Review of Risk Mitigation Instruments for Infrastructure Financing and Recent Trends and Developments
Review of Risk Mitigation Instruments for Infrastructure Financing and Recent Trends and Developments
Library
Public-Private Partnerships in the New EU Member States - Managing Fiscal Risk
Public-Private Partnerships in the New EU Member States
Library
Allocating Risks in Public-Private Partnerships
The Global Infrastructure Hub (GI Hub), based in Sydney, Australia, is an organisation established by the G20 group of nations to foster innovative approaches to global infrastructure development.…
Library
Overcoming political risk for SMEs through infrastructure investment
Overcoming political risk for SMEs through infrastructure investment
Library
Asignación de riesgo en contratos de Asociación Público-Privada (PPP Risk Allocation Tool)
Como parte de su mandato de ‘prácticas de liderazgo’, el GI Hub está desarrollando una serie de matrices anotadas de asignación de riesgo para transacciones de asociaciones público-privadas (APP), en…
Library
政府和社会资本合作风险分配(Allocating Risks in Public-Private Partnerships)
总部位于澳大利亚悉尼的全球基础设施中心(GIH),由G20国家集团成立的组织,致力于促进全球基础设施创新方法的发展。GIH主要工作之一是促进高质量的基础设施投资的“领先实践”,包括项目准备和选定、项目采购等方面的指导材料的编制与传播。作为各类PPP交易的中心事项之一,对风险分配安排的深入理解是起草每份PPP协议的先决条件。风险分配原则的恰当运用是为确定某PPP项目是否“具有投资价值”(注,…
Library
The Electrical Social Compensation Fund (FOSE) - Peru
The Electrical Social Compensation Fund (FOSE) - Peru
Library
政府和社会资本合作的风险分配项目反应理论工具
政府和社会资本合作的风险分配项目反应理论工具
Library
Contingent liabilities - a threat to fiscal stability
Contingent liabilities - a threat to fiscal stability
Library
Disruptive Technologies and the World Bank Group—Creating Opportunities—Mitigating Risks
A working paper ” prepared by the World Bank Group for the October 13, 2018 Development Committee Meeting.
Library
Artificial Intelligence (AI) in Construction Market to Reach USD 4.51 Billion By 2026
Artificial Intelligence in Construction Market Size – USD 429.2 Million in 2018, Market Growth - CAGR of 34.0%, AI in Construction Industry Trends – Easy risk mitigation.
Library
2020 Global Risks for Infrastructure: Appendix
This website provides downloadable resources for the 2020 Global Risks for Infrastructure: Appendix.
Library
Disruptive Technology Brings Risk and Opportunity to Infrastructure Projects
The infrastructure industry has not typically been known for its embrace of new technology. In a recent paper, the World Economic Forum (WEF) attributed the industry’s relatively slow adoption…
Article
Recommendations in Drafting ToRs for Pre-Feasibility and Feasibility Studies
Annex 3 of the Annex for IRI Guide: Drafting TOR of Pre-Feasibility and Feasibility Study with CVCIn order for Project Owners to practically operationalize CVC, engaging a qualified expert and…
Article
CVC in Waste Recycling
Worked Example 5: Waste RecyclingDriven by rapid urbanization and growing populations, 353 million tonnes of plastic waste generated in 2019.1 Only 9% of the plastic waste is recycled while 50%…
Article
CVC in Affordable Housing
Worked Example 4: Affordable Housing According to the World Bank, 1.6 billion people around the world are estimated to be affected by the global housing shortage by 2025.1 In most countries…
Article
CVC in Public Hospitals
Worked Example 3: Public HospitalDeveloping countries face a wide range of complex healthcare challenges spurred by changing demographics, a growing burden of chronic disease, rising healthcare costs…
Article
CVC for Urban Transit
Worked Example 2: Urban TransitLarge cities in developing countries typically lack effective public transport service with high dependency on cars. As a result, traffic congestion and long travel…
Article
CVC for Wastewater Treatment Plant
Worked Example 1: Wastewater Treatment PlantWith growing populations and rapid urbanisation, an estimated 380 billion cubic meters of wastewater is generated annually worldwide and it is a growing…
Article
Assessing and Mitigating CVC Related Risks
table, th, td { border:1px solid #ffffff; padding:10px } If the CVC has high implementation readiness and resources are available to implement CVC, Project Owners should proceed to risk…
Tab Landing Page
Financing Options and Instruments
This section presents different modes of financing an asset recycling finance. Private sector participants in an asset recycling transaction will be required to fund the upfront payment to secure the…
Article
Risk Identification and Allocation in Asset Recycling
The Relevant Authority should identify and allocate risks for the concession or lease arrangement as part of the transaction preparation. The objective is to ensure that specific risks are…
Library
Risk Allocation in Toll Highway Concessions in Spain
The objective of this study is threefold. First, the consequences of the economic recession that struck Spain beginning in 2008 on the outcome of the concession contracts are assessed. Second, the…
Article
Monitoring and Managing PPP Delivery and Risk
To achieve the whole life value for money promised by a PPP, government needs to make sure that the planned allocation of responsibilities and risks is put into practice, monitored, recorded and…