Designing a Performance-Based Contract: Case Study Exercise
Exercise in the design of a PBC, including:
- initial design considerations
- PBC design principles
- terms and conditions of the contract
This exercise was part of the Non-Revenue Water Performance-Based Contracts training that took place in Washington DC in March 2017.
A presentation on Performance Based Contracts in Non- Revenue Water Reduction Programs, delivered on March 2017
Session 7: Exercise on PBC Design and Risk Allocation