Page Specific Disclaimer

This section has not been prepared with any specific transaction in mind and are meant to serve only as general guidance. It is therefore critical that the content will be reviewed and adapted for specific transactions. 

This is a new section of the website and is currently in draft form. For feedback on the content of this section or to suggest additional links or materials, please contact the PPP Resource Center using the feedback form.

 

 

image
Photo Credit:   Image by Pixabay

Annex in Asset Recycling

The Guidelines are also supplemented with following Annex:

  • Sector-specific asset recycling guidelines for airports, power, roads, and ports sectors, including sector-specific due diligence requirements, sample risk allocation matrix and sample terms of reference (TOR) for selection of transaction advisors.
  • Template for term sheet for a typical concession/ lease model for an asset recycling transaction.
  • The range of bid parameters for a typical concession/ lease model for an asset recycling transaction.
  • The bundling and unbundling criteria for assets considered for asset recycling transaction.
  • The governance requirements of a project company (JV) for asset recycling transaction.

Modules

Airport Module Module 1 of the Annex in Asset Recycling. Find operational criteria in selecting an appropriate asset as the subject.… more
Power Generation Module Module 2 of the Annex in Asset Recycling. The Relevant Authority should undertake a due diligence study of the power… more
Toll Roads Module Module 3 of the Annex in Asset Recycling. A due diligence study of the toll roads asset that is considered for asset… more
Ports Module Module 4 of the Annex in Asset Recycling. This annexure sets out sector-specific asset recycling guidelines for the… more
Sample Term Sheet Module 5 of the Annex in Asset Recycling. This term sheet sets out a framework for the terms and conditions to be set… more
Bid Parameters Module 6 of the Annex in Asset Recycling. It is important the Relevant Authority tailor the bid evaluation parameters… more
Bundling and Unbundling Criteria Module 7 of the Annex in Asset Recycling. Key considerations if the Relevant Authority consider bundling multiple… more
Elements for Governance of Project Company (JV) Module 10 of the Annex in Asset Recycling. This checklist sets out some of the key aspects for the Joint Venture (“JV… more
Asset Recycling Projects
Concession and Lease ModelsInfrastructure is pivotal to sustainable development with positive impacts on the economy,… more
Note/s:

This section has not been prepared with any specific transaction in mind and are meant to serve only as general guidance. It is therefore critical that the content will be reviewed and adapted for specific transactions. 

This is a new section of the website and is currently in draft form. For feedback on the content of this section or to suggest additional links or materials, please contact the PPP Resource Center using the feedback form.